Rural intersection: side road setup corridor
Total video time: 5:25
Last updated: 2020-10-26
Side road ETW setup corridor
Exercise files: rurl-int-crdr-edglin-ali-end-c3d16.zip
Start with: 12345678\Design\Corridors\Crdr-25-4thAve.dwg
Comment: In the AliProf.dwg we made a Highway 25 setup corridor which will be used to tie down the curb and gutter elevation. We need another setup corridor to tie down the curb and gutter elevations for 4th Ave.
- Create the Assembly
- WisDOT Design tab > WisDOT & Civil Imperial palette > General tab
- Home tab > Create Design > Assembly > Create Assembly
- Place the Assembly off to the side
- MultiUseWidthAndSlopeLinks > Place on the assembly
Right inside width 20.000' Right inside SE Use outside lane SE Right outside width 5.000' Right outside SE Use outside lane SE Left inside width 20.000' Left inside SE Use outside lane SE Right outside width 5.000' Right outside SE Use outside lane SE - OK
- Home tab > Create Design > Corridor
- Set the Baseline and Region Parameters to the end of each taper
-
Set the frequencies to 2.5'
- OK > OK > Rebuild Corridor
- Add Sections at the back of curb
- Create corridor surface > adjust the name > No Display > Top code > Add as a breakline > OK
- In the corridor change the code set to No Display and the feature lines to No Display